things-to-do
Mumbai Coastal Road guide: what the Marine Drive-Worli phase includes
A project explainer describes the Coastal Road's first phase, tunnels, road layout, promenade and the planned wider route.
How we reported this

The Mumbai Coastal Road is best understood as a series of linked pieces rather than a single stretch of asphalt. A project explainer describes the first phase as a route running from Marine Drive to the Worli end of the Bandra-Worli Sea Link connection. The same explainer identifies the Brihanmumbai Municipal Corporation as the builder and describes the wider project as extending northwards in later phases.
One of the most distinctive parts of the route is the twin-tunnel section beneath the Malabar Hill area. The source describes the tunnels as part of the Marine Drive-Worli phase and notes that the road uses different lane arrangements in ordinary sections and in the tunnels. It also describes the project as including reclaimed coastal land and a public promenade. Those elements matter because the road is both a transport intervention and a reshaping of Mumbai's western edge.
The project explainer lists a total length once the described sections are ready. It separately identifies the Versova-to-Dahisar and Bhayandar direction as the northward extension. Since construction and operating conditions can change, the total should be read as the source's project description rather than as a claim that every future section is open to traffic. The same caution applies to any route planning based on the wider map.
For drivers, the source describes the first phase as open to cars and lists it as toll-free. A current trip still requires checking traffic restrictions, closures, weather conditions and official notices. A project overview can explain how the road is laid out, but it cannot replace a live traffic update. Residents who are walking or cycling should also distinguish the road carriageway from the promenade and verify which public areas are accessible on the day.
The Coastal Road's local story is therefore about connection and public space at the same time. Marine Drive, the tunnel section, the Worli connection and the coastal promenade appear in the source as parts of one large BMC project. The explainer also discusses future extensions and the road's relationship with surrounding neighbourhoods. It does not prove a universal travel-time saving for every journey, so the grounded takeaway is the route's structure: a first phase in the south, a tunnel beneath the coast and a planned northward network.